Free Quote — We reply in 2 minGet Quote

House Construction in Aldea Zamá

Turnkey new builds in Aldea Zamá: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.

Recrea has been building houses in Aldea Zamá and its residential sections since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.

House construction cost in Aldea Zamá (2026): $15,600 – $32,400 MXN/m² ($860 – $1,790 USD/m²) depending on finish level, land not included.

How Much House Construction Costs in Aldea Zamá

Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).

House sizeConstruction costEquivalent
100 m² house$2.0M – $3.2M MXN$110,000 – $177,000 USD
150 m² house$3.5M – $5.9M MXN$193,000 – $326,000 USD
200 m² house$4.6M – $7.8M MXN$254,000 – $431,000 USD
300 m² house$9.7M – $17.5M MXN$536,000 – $967,000 USD

Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.

House Construction Process Step by Step

This is how we run every new build, with the timings we actually see in Aldea Zamá:

1. Lot review

Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.

1–2 weeks

2. Concept and budget

Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.

2–3 weeks

3. Construction documents

Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.

4–6 weeks

4. Permits and licences

Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.

4–20 weeks

5. Foundation

Soil mechanics, rock excavation, footings or mat foundation and under-slab services.

3–5 weeks

6. Shell and structure

Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.

10–16 weeks

7. Services and finishes

Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.

12–20 weeks

8. Turnkey handover

Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.

1–2 weeks

Total: 8 to 14 months of construction plus 3–5 months of design and permits.

What the Price per m² Includes — and What It Does Not

Included
  • Architectural, structural and MEP design
  • DRO and municipal building licence
  • Foundation and reinforced concrete structure
  • Electrical, plumbing and air-conditioning installation
  • Plaster, floors, paint, closet and kitchen carpentry
  • Ironwork, aluminium joinery and anti-corrosion protection
  • Cistern, water tank and pressure system
  • Final cleaning, testing and written 1-year warranty
Not included
  • The land and notary costs
  • Furniture and décor (quoted separately as FF&E)
  • Pool, landscaping and palapa if not contracted in the package
  • Solar panels, generator or home automation (optional)
  • Changes you request once construction has started

Permits and Building Rules in Aldea Zamá

Tulum is the strictest municipality on the coast. On top of land use and the municipal licence with a DRO, most projects need environmental authorisation from SEMA (and an MIA where there is land clearing or proximity to cenotes or mangrove). The PDU caps density and height by zone and requires a minimum permeable green area. Budget 3 to 5 months for permits.

The lot: what decides your foundation

Fractured limestone with frequent cenotes and caverns, especially in Región 15 and La Veleta. A geophysical survey is not optional here: finding a cavern under the footprint after the foundation has started costs weeks of delay and hundreds of thousands of pesos.

Aldea Zamá is Tulum’s urbanised premium zone: underground services, finished streets and the city’s strongest vacation-rental demand. The dominant style is eco-chic — chukum, hardwood, cross ventilation — and SEMA environmental processing is effectively mandatory, so the permit calendar drives the construction calendar.

Useful guides: Luxury villas in Aldea Zamá · Construction permits in Aldea Zamá · House construction in Tulum · Cost calculator

Why Build With Recrea

  • 196+ completed projects in the Riviera Maya since 2008
  • Fixed-price contract broken down by line item — no surprise overruns
  • One company for everything — architecture, permits, construction, electrical, carpentry, ironwork
  • Licensed DRO and architects — fully legal build, workers registered with IMSS
  • Weekly photo and video reports — built for owners who live abroad
  • Written 1-year warranty on structure and installations

Real Projects

House Construction in Aldea Zamá — Recrea
House Construction in Aldea Zamá — Recrea

Or send us your project details

Frequently Asked Questions

From $15,600 – $32,400 MXN per m² depending on finish level. A 150 m² house with a pool runs $3.5M – $5.9M MXN, land not included.

8 to 14 months of construction plus 3–5 months for design and permits. From first meeting to handover: 12 to 18 months for a 150–200 m² house.

Yes. After the construction documents we issue a closed itemised budget and a fixed-price contract with payments tied to verified progress. Only changes you request move the price.

Half our clients do. Bilingual fixed-price contract, milestone payments and a weekly photo and video report of real progress on your house.

3 to 5 months, because SEMA is almost always involved on top of the Tulum municipal licence. We start the process in parallel with the construction documents so you do not lose a season.

It is the strongest short-term rental zone in Tulum. We design guest-oriented layouts, a pool and an FF&E package, and plan for the operating licence from the design stage.

Free quote for your house in Aldea Zamá

196+ completed projects. Fixed-price contracts. We reply in 2 minutes.

Get a quote on WhatsApp
Written 1-year warranty18+ years196+ projectsLicensed & DROInsured