Turnkey new builds in Punta Brava, Puerto Morelos: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Punta Brava and the coast south of Puerto Morelos since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $2.0M – $3.2M MXN | $110,000 – $177,000 USD |
| 150 m² villa | $3.3M – $5.7M MXN | $182,000 – $315,000 USD |
| 200 m² villa | $4.4M – $7.5M MXN | $243,000 – $414,000 USD |
| 300 m² villa | $9.2M – $17.0M MXN | $508,000 – $939,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Branded residences / resort | $140,000 – $235,000 USD | International hospitality standard: spa, restaurant, common areas and resort service |
| Premium boutique | $110,000 – $175,000 USD | Generous room, pool, terrace and designed common areas |
| Entry boutique | $85,000 – $135,000 USD | Complete room with the community’s finish standard, simple common areas |
This is how we run every new build, with the timings we actually see in Punta Brava, Puerto Morelos:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 3–5 months of design and permits.
Punta Brava is in the municipality of Puerto Morelos, independent since 2016 and stricter than its neighbours because of the reef: land use and the building licence are processed there with drawings signed by a DRO. Beachfront lots require a ZOFEMAT concession, and the proximity of the Puerto Morelos Reef National Park and the wetlands usually triggers environmental authorisation with conditions on clearing, runoff and wastewater treatment. Lodging adds another layer: a land-use certificate with hotel designation — not every lot allows it, and it is the first thing we verify — the operating licence, Civil Protection sign-off, a CFE electrical project sized to occupancy and tourism registration. A restaurant open to the public adds health and capacity requirements.
Limestone with a very shallow water table and wetlands nearby: the soil study sets the foundation and, above all, the finished floor level so natural runoff is not compromised. On the beachfront, a full marine spec — greater cover, treated ironwork, anodised joinery, reinforced waterproofing — because the reef is metres away and salt breeze is constant.
Punta Brava has the reef metres offshore and protected wetlands inland, south of Puerto Morelos. The product is a beachfront villa or small nature-led lodging; everything is designed not to affect the Reef National Park, with wastewater treatment and runoff control from the first drawing.