Turnkey new builds in Xpu-Há: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Xpu-Há, its private communities and the bay since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $2.0M – $3.0M MXN | $110,000 – $166,000 USD |
| 150 m² house | $3.3M – $5.5M MXN | $182,000 – $304,000 USD |
| 200 m² house | $4.3M – $7.3M MXN | $238,000 – $403,000 USD |
| 300 m² house | $9.2M – $16.5M MXN | $508,000 – $912,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
See every zone in Playa del Carmen
This is how we run every new build, with the timings we actually see in Xpu-Há:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 2–4 months of design and permits.
In Solidaridad the process starts with the land-use certificate and the current PDU: it sets how many storeys and what building density your lot allows. The building licence requires drawings signed by a DRO registered with the municipality, a structural report and services plans. If the lot borders mangrove, dune or a cenote, a state environmental permit is added.
Limestone with cavities and a shallow water table, typical of the coast: the soil study decides between footings, a mat foundation or piles. Being close to the sea, rebar and ironwork get anti-corrosion protection, and on beach lots waterproofing is reinforced and the floor level checked against runoff.
Xpu-Há is a bay twenty minutes south of Playa del Carmen, with private communities such as Estrella de Mar and Arrecife: lots of 600 to 800 m², hydraulic concrete streets, water, power, drainage and conservation areas inside the development itself. It is the beach option with full services at a more reasonable price than Tulum or Puerto Aventuras, in the Solidaridad municipality, with the shortest permit timelines on the southern coast.
Useful guides: House construction in Puerto Aventuras · House construction in Playa del Carmen · Construction company in Puerto Aventuras · Cost calculator


196+ completed projects. Fixed-price contracts. We reply in 2 minutes.