Lots in Felipe Carrillo Puerto sell when buyers drive in on a finished street with water, sewer and power ready; we build that infrastructure phase by phase. The municipality of Felipe Carrillo Puerto issues licences, while many rural roads cross ejido land and require agreements with the ejido assembly; state and federal programmes often co-fund rural paving.
Gatehouse, access control, perimeter wall, parks and clubhouse to complete the project.
Asphalt, concrete or paver streets with kerbs, accessible sidewalks, ramps and signage.
Inlets, collectors and infiltration wells designed for the street catchment and the karst.
Heavy seasonal rain on flat land floods low-lying streets and rural roads; side drains, culverts and raised road levels matter more than infiltration wells here. The drainage of every street is designed for these conditions and tested before the pavement goes on.
About two hours from our yard; materials and hot mix may come from plants in the centre or south of the state, and logistics are planned for full truckloads to justify the distance. Materials and crews are planned around these constraints so each phase is ready when sales need it.
Felipe Carrillo Puerto needs rural roads, streets in growing colonias, car parks and yards for commerce and agro-industry, and access roads to ejido and Tren Maya-related projects in the region.
Inland, away from the coast, the ground is firm limestone with red soils in places, generally good for road bases, but rock outcrops and occasional sinkholes still need attention.
| Item | Includes | Price (MXN) |
|---|---|---|
| Complete infrastructure | Streets, water, sewer, drainage, power, lighting | $1,200–$2,300 / m² of street |
| Per residential lot | Depends on frontage and services | $162,000–$405,000 / lot |
| Kerbs and sidewalks | Cast kerb + 10 cm concrete sidewalk | $340–$580 / m · $430–$760 / m² |
| Storm infiltration well | Drilled well, cased, with inlet and sediment trap | $40,500–$108,000 each |
Useful pages: Subdivision Infrastructure — Riviera Maya · Asphalt Repair & Maintenance in Felipe Carrillo Puerto · Earthworks & Site Prep in Felipe Carrillo Puerto · Road Construction in Felipe Carrillo Puerto
Streets, networks and drainage built to utility standards, phased to your sales. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews