Every project in Cancún starts with the platform: clearing, rock, fills and levels done right decide whether floors crack, pools leak and roads sink. Downtown and the south-west sit on firm limestone close to the surface with pockets of sascab, while the Hotel Zone and lagoon edges are sand and fill over mangrove soils, where bases must be thicker and compaction checked more carefully.
Probing and geophysical surveys where karst voids are suspected, followed by filling or bridging.
Spoil removed to authorised sites and reuse of excavated rock as fill where it meets specification.
Hydraulic breakers and rock saws for foundations, pools, cisterns, utility trenches and basements.
Works are licensed by Benito Juárez; connections to Kukulcán Boulevard, Bonampak or federal Highway 307 need municipal road authority or SCT approval, and new subdivisions are received by the municipality and Aguakan only with test reports and as-built drawings. We confirm these authorisations before any machine enters the site.
Large parts of the city flood in heavy storms because there is little storm sewer; every parking lot or street needs its own inlets and infiltration wells, and the water table near the lagoon limits how deep those wells can work. Platforms are graded so that rain moves away from buildings toward planned infiltration points.
Cancún has the shortest haul to hot-mix plants and sascab and crushed-stone quarries in the north of the state, so asphalt arrives hot and material prices are the regional benchmark.
Traffic on main avenues forces night work for connections and resurfacing; the rainy season from June to October is the hardest time for earthworks, and the drier months from December to May are the best paving window.
| Work | Detail | Price (MXN) |
|---|---|---|
| Clearing and stripping | Vegetation + 15–30 cm organic soil | $20–$40 / m² |
| Excavation in limestone | Hydraulic breaker, load and stockpile | $280–$650 / m³ |
| Compacted sascab fill | Supplied, 20 cm layers, 95% Proctor | $320–$520 / m³ |
| Spoil haulage | To authorised site, up to 20 km | $90–$180 / m³ |
Useful pages: Earthworks & Site Prep — Riviera Maya · Road Construction in Cancún · Asphalt Paving in Cancún · Concrete & Pavers in Cancún
Clearing, rock, fills and platforms tested layer by layer. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews