Every rainy season and hurricane leaves potholes in Tulum; we repair with hot mix and rebuilt bases, then seal and re-stripe so the same spots do not fail again. There is almost no storm sewer, so water must be infiltrated on site; permeable paving, swales and infiltration wells are the usual design, always located away from cenotes and septic or treatment systems.
Broken slab replacement, joint resealing and kerb and sidewalk repair.
Saw-cut, excavation of wet or broken base, recompaction, tack coat and hot mix, rolled flush.
Protective coatings that restore colour, close the surface and add years to tired asphalt.
Rainy-season downpours from June to October stop earthworks for days; the busiest tourist months from December to April slow deliveries on the federal highway, so heavy works are best planned for May and November. Repairs and sealing are scheduled in these windows, by sections, with traffic kept moving.
Hot mix travels from plants in the north or is produced in smaller local batches, a long haul that shrinks the laying window; concrete, pavers and stabilised sascab are often the practical choice for remote private roads. We choose hot mix, concrete or pavers for each repair according to this supply situation.
Tulum is building fast: access roads and streets for new subdivisions in Region 15 and La Veleta, private roads to jungle villas and eco-hotels, car parks near the new airport and the Tren Maya station, and many sascab tracks waiting to be paved.
Tulum’s urban development plan sets minimum absorption areas on each lot, so hard paving is limited and permeable solutions are often required; clearing jungle needs SEMARNAT authorisation, and near the National Park extra environmental review applies.
| Work | Includes | Price (MXN) |
|---|---|---|
| Structural pothole repair | Cut, base repair, tack, 5–7 cm hot mix | $430–$850 / m² |
| Crack sealing | Routing + hot rubberised sealant | $40–$80 / linear m |
| Seal coat / slurry seal | Cleaning + protective coating | $50–$150 / m² |
| Milling + overlay | 3–5 cm milling + 4 cm hot mix | $380–$630 / m² |
Useful pages: Asphalt Repair & Maintenance — Riviera Maya · Earthworks & Site Prep in Tulum · Road Construction in Tulum · Asphalt Paving in Tulum
Permanent hot-mix repairs, sealing and maintenance plans. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews