Every rainy season and hurricane leaves potholes in Cancún; we repair with hot mix and rebuilt bases, then seal and re-stripe so the same spots do not fail again. Large parts of the city flood in heavy storms because there is little storm sewer; every parking lot or street needs its own inlets and infiltration wells, and the water table near the lagoon limits how deep those wells can work.
Protective coatings that restore colour, close the surface and add years to tired asphalt.
Broken slab replacement, joint resealing and kerb and sidewalk repair.
Saw-cut, excavation of wet or broken base, recompaction, tack coat and hot mix, rolled flush.
Traffic on main avenues forces night work for connections and resurfacing; the rainy season from June to October is the hardest time for earthworks, and the drier months from December to May are the best paving window. Repairs and sealing are scheduled in these windows, by sections, with traffic kept moving.
Cancún has the shortest haul to hot-mix plants and sascab and crushed-stone quarries in the north of the state, so asphalt arrives hot and material prices are the regional benchmark. We choose hot mix, concrete or pavers for each repair according to this supply situation.
Cancún generates most of the paving work in the state: industrial parks and logistics yards along the airport road and Highway 307, plaza and hotel car parks, new subdivisions in the south-west and constant resurfacing of condo streets and private roads.
Works are licensed by Benito Juárez; connections to Kukulcán Boulevard, Bonampak or federal Highway 307 need municipal road authority or SCT approval, and new subdivisions are received by the municipality and Aguakan only with test reports and as-built drawings.
| Work | Includes | Price (MXN) |
|---|---|---|
| Structural pothole repair | Cut, base repair, tack, 5–7 cm hot mix | $380–$750 / m² |
| Crack sealing | Routing + hot rubberised sealant | $40–$70 / linear m |
| Seal coat / slurry seal | Cleaning + protective coating | $40–$130 / m² |
| Milling + overlay | 3–5 cm milling + 4 cm hot mix | $340–$560 / m² |
Useful pages: Asphalt Repair & Maintenance — Riviera Maya · Earthworks & Site Prep in Cancún · Road Construction in Cancún · Asphalt Paving in Cancún
Permanent hot-mix repairs, sealing and maintenance plans. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews