Hotels, hospitals, banks, telecoms and government in the Riviera Maya need computing that stays up through blackouts and hurricanes. We build edge data centres, server rooms and data rooms: hurricane-rated shell, redundant power with UPS and generators, precision cooling, raised floor, clean-agent fire suppression and access control — to the redundancy level your operation needs.
Dual utility feeds where available, UPS, generators and automatic transfer.
CRAC or in-row units, hot/cold aisle containment, N+1 redundancy.
Clean-agent systems, early smoke detection and sealed rooms.
Reinforced concrete envelope, no windows, raised above flood level.
Raised floor or overhead trays, structured cabling and grounding.
Mantrap, biometric access, CCTV and monitoring.
The building itself is a small part of a data centre budget; power and cooling are most of it. We size UPS, generators and cooling to the real IT load and growth plan, decide the redundancy level (N, N+1, 2N) with you and phase equipment so you do not pay for capacity years before it is used.
Heat, humidity, salt air and hurricanes are the enemies here. The room is a sealed concrete box above flood level, with humidity control, corrosion-resistant equipment, fuel for days of autonomy and a tested switchover before handover.
| Town | Factor | 500 kW edge data centre |
|---|---|---|
| Cancún | ×1.00 | $70M–$120M |
| Playa del Carmen | ×1.04 | $72.8M–$124.8M |
| Chetumal | ×0.92 | $64.4M–$110.4M |
| Item | Cost |
|---|---|
| Server room / data room fit-out, per m² (raised floor, cooling, fire suppression) | $45,000–$90,000 |
| Edge data centre, per kW of IT load | $140,000–$240,000 |
| UPS and generator, per 100 kW | $3.5M–$7M |
| Precision cooling (CRAC / in-row), per 100 kW | $2.5M–$5M |
| Clean-agent fire suppression, per room | $0.6M–$1.8M |
| 500 kW edge data centre, complete | $70M–$120M |
Related: Car wash construction
Commercial cost calculator · Plazas · Offices
Industrial warehouses
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews