How Much Does a Data Centre Cost to Build in Mexico? (2026)
Cost of a data centre in Quintana Roo in 2026: the line items that make the budget, prices by town and what drives the cost. Figures from our own quotes and market prices.
Related: Data centre construction · Cancún · Playa del Carmen · Chetumal · Industrial warehouses
1. Costs in 2026 (Cancún base)
| Item | Cost |
|---|---|
| Server room / data room fit-out, per m² (raised floor, cooling, fire suppression) | $45,000–$90,000 |
| Edge data centre, per kW of IT load | $140,000–$240,000 |
| UPS and generator, per 100 kW | $3.5M–$7M |
| Precision cooling (CRAC / in-row), per 100 kW | $2.5M–$5M |
| Clean-agent fire suppression, per room | $0.6M–$1.8M |
| 500 kW edge data centre, complete | $70M–$120M |
2. By town
| Town | Factor | 500 kW edge data centre |
|---|---|---|
| Cancún | ×1.00 | $70M–$120M |
| Playa del Carmen | ×1.04 | $72.8M–$124.8M |
| Chetumal | ×0.92 | $64.4M–$110.4M |
| Cozumel | ×1.22 | $85.4M–$146.4M |
| Isla Mujeres | ×1.26 | $88.2M–$151.2M |
| Holbox | ×1.30 | $91M–$156M |
3. Power and cooling are the budget
The building itself is a small part of a data centre budget; power and cooling are most of it. We size UPS, generators and cooling to the real IT load and growth plan, decide the redundancy level (N, N+1, 2N) with you and phase equipment so you do not pay for capacity years before it is used.
4. Designed for this climate
Heat, humidity, salt air and hurricanes are the enemies here. The room is a sealed concrete box above flood level, with humidity control, corrosion-resistant equipment, fuel for days of autonomy and a tested switchover before handover.
5. Not included
- Land, VAT and financing
- Design and permits: 6–10% of construction
- Contingency 5–10%