Every restaurant, hotel and delivery brand in the Riviera Maya lives or dies in the kitchen. We build commercial kitchens, dark kitchens and central production kitchens: extraction hoods and fire suppression, gas and power, cold rooms, grease traps, washable finishes and the workflow that lets a team cook hundreds of covers without crossing paths — ready for the health inspection.
Hoods, ductwork, make-up air and fans sized for the cooking line.
Wet-chemical systems over the line, gas shut-off and detection.
Walk-in coolers and freezers with remote condensers.
Floor drains, slopes and grease traps that pass inspection.
Epoxy or quarry-tile floors, washable walls, stainless.
Receiving, prep, cook, pass and wash planned with your chef.
A kitchen is a production line: receiving, cold storage, prep, cooking, pass and wash. We lay out the flow with your chef or operator first, then place equipment, utilities and drains — so nothing is moved after the slab is poured.
Delivery-only kitchens put several brands in one space. We design separate stations sharing cold rooms, wash and extraction, rider pick-up away from the cooks and enough power and gas for all brands at peak.
| Town | Factor | Dark kitchen, 250 m² |
|---|---|---|
| Cancún | ×1.00 | $6M–$12M |
| Playa del Carmen | ×1.04 | $6.2M–$12.5M |
| Cozumel | ×1.22 | $7.3M–$14.6M |
| Chetumal | ×0.92 | $5.5M–$11M |
| Item | Cost |
|---|---|
| Commercial kitchen fit-out, per m² | $18,000–$35,000 |
| Extraction hood and fire suppression, per linear metre | $45,000–$90,000 |
| Walk-in cold room | $0.3M–$0.9M |
| Grease trap and drainage | $0.1M–$0.4M |
| Dark kitchen for 4–6 brands, 250 m² | $6M–$12M |
| Hotel or central production kitchen, 600 m² | $18M–$35M |
Related: Hostel construction · Golf clubhouses
Commercial cost calculator · Plazas · Offices
Restaurant & bar fit-out
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews