New corporate and mixed-use towers in Cumbres, Malecón Tajamar, Puerto Cancún and along Av. Bonampak deliver offices as obra gris: bare slab, rough-in services, sometimes the facade glazing and little else. We inspect the unit at handover, get the building’s approval, connect to its risers and meters, and fit out the office on a fixed price and date.
Slab levels, glazing seals, rough-ins and A/C positions documented before you sign.
Drawings to the administration, hours, lifts, deposits and insurance.
Electrical, A/C condensate and data connected to the tower’s system.
Offices, meeting rooms and open plan around the core and facade.
VRF or split systems where the tower allows, lighting for screens.
Joinery, furniture and signage, ready on the agreed date.
Floor finishes and levelling, ceilings, partitions, toilets inside the unit, A/C units, lighting, data cabling, and often the electrical panel and the meter connection. Every tower is different, so we read the developer’s delivery specification with you and price exactly what is missing.
Design and order long-lead items — A/C, glazing partitions, joinery — during the developer’s final months, and the office can open weeks after handover instead of months.
| Office size | Basic | Corporate |
|---|---|---|
| 60 m² | $0.36M–$0.72M | $0.72M–$1.5M |
| 100 m² | $0.6M–$1.2M | $1.2M–$2.5M |
| 200 m² | $1.2M–$2.4M | $2.4M–$5M |
Offices cluster: Offices: build, fit out, renovate · Coworking construction · Medical & dental offices · Office maintenance · Cost to build an office building · Office fit-out cost
Commercial cost calculator · Plazas & shopping centres
Send the plan or the address; we visit, check the building and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews