Free Quote — We reply in 2 minGet Quote

Hotel Facade Restoration and Hurricane Hardening

On the Caribbean, a hotel facade takes salt spray every day and a hurricane every few years. Spalled balconies, leaking windows, failed roof waterproofing and rusted railings damage rooms, ratings and insurance terms. We restore and harden hotel envelopes floor by floor while the hotel operates.

Hotel facade restoration by Recrea
A Recrea Construction project
2026 costs: balcony and slab-edge concrete repair $8,000–$25,000 MXN per balcony; impact-rated glazing $9,000–$18,000 MXN per m² of window; roof waterproofing $450–$1,200 MXN/m²; facade coating systems $350–$900 MXN/m².

What We Restore and Harden

Concrete Repair

Balconies, slab edges and columns with corroded rebar repaired to engineering spec.

Impact Glazing

Windows and sliding doors rated for hurricane pressure and debris.

Roof Waterproofing

Membranes, drains and parapets that stop leaks into top floors.

Facade Coatings

Elastomeric and anti-carbonation systems for salt exposure.

Railings

316 stainless and glass railings to current height and load rules.

Storm Readiness

Shutters, anchorage of rooftop equipment and drainage for storm events.

Working from the outside, floor by floor

We use suspended platforms or scaffolding by stack, block rooms in groups, and keep noise within agreed hours. Each drop is inspected, repaired and sealed before moving on, with photo records for owners and insurers.

Facade and Hardening Costs (2026)

WorkUnitCost (MXN)
Balcony / slab-edge repairPer balcony$8k–$25k
Impact glazingPer m² of window$9k–$18k
Roof waterproofingPer m²$450–$1,200

Useful pages: Hotel Services · Hotel Development Management · Brand Conversion & PIP · Hotel construction in Cancún · Hotel cost calculator

Why Hotels Choose Recrea for Facades

  • One contractor for the whole hotel — structure, MEP, interiors, back-of-house, pools and site
  • Works while the hotel operates: phasing agreed with operations and revenue management
  • Brand and code compliance: operator design standards, Protección Civil, NOM and environmental conditions
  • Open-book or fixed price, weekly reporting for owners, asset managers and lenders
  • 18+ years and 196 projects in the Riviera Maya, own steel and carpentry workshops

Tell us about your facade

Frequently Asked Questions

Yes, by stacks of rooms with suspended access and agreed noise hours.

It often improves insurance terms and reduces storm damage and downtime; we document the specification for your insurer.

For a 200-key tower, typically 4–8 months phased by stack.

Start with a facade inspection

Condition survey, priorities and phased budget. Reply in 2 minutes.

Quote on WhatsApp
Concrete repairImpact glazingWaterproofing316 railingsHotel stays open18+ Years

Related: Hotel Renovation in Cancún · Restaurant & Bar Fit-Out in Cancún · Beach Clubs & Spas in Cancún · Luxury Villa Renovation in Cancún · Wastewater Treatment Plants in Cancún · Water Purification & Desalination in Cancún · Villa Wastewater Systems in Cancún · Rainwater & Greywater Reuse in Cancún · Structural Steel in Cancún · Steel Roofs & Canopies in Cancún · Mezzanines & Floor Additions in Cancún · Steel Frame Homes in Cancún · Architectural Metalwork in Cancún · Corrosion Protection & Repair in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews