Free Quote — We reply in 2 minGet Quote

Hotel Development Management and Owner's Representation

Building or repositioning a hotel means coordinating an architect, an interior designer, an operator with its technical standards, a lender, a dozen specialists and the authorities. Owners who live in Mexico City, Miami or Madrid need someone on their side of the table who speaks construction, controls the budget and protects the opening date.

Hotel development management by Recrea
A Recrea Construction project
2026 fees: feasibility and technical due diligence $180,000–$600,000 MXN; development management 2–4% of construction cost or a monthly retainer of $150,000–$450,000 MXN depending on size.

What We Manage

Feasibility & Due Diligence

Land use, density, utilities, soils and a cost-per-key model before you commit.

Brand Technical Standards

Translating the operator's standards into the design brief and checking every drawing against them.

Design Management

Coordinating architect, interior designer and engineers so drawings arrive complete and buildable.

Budget & Schedule Control

Cost plans, change control, cash-flow and critical path, reported monthly to owners and lenders.

Procurement

Tendering, FF&E and OS&E coordination, long-lead items and logistics.

Handover & Opening

Commissioning, snagging, as-builts and operator acceptance.

Why owners hire a representative

Hotels fail on schedule and budget at the interfaces: the kitchen designer’s loads that the engineer never saw, the brand requirement that appears after tender, the long-lead glazing ordered too late. An owner’s representative with construction experience in Quintana Roo catches these before they cost money, and keeps permits, utilities and procurement moving in parallel.

Development Management Fees (2026)

ServiceScopeIndicative fee (MXN)
Feasibility & technical due diligenceSite, permits, utilities, cost per key$180k–$600k
Development managementDesign to opening2–4% of construction
Monthly retainerOwner's rep on site and in meetings$150k–$450k / month

Useful pages: Hotel Services · Brand Conversion & PIP · Hotel MEP & Energy · Hotel construction in Cancún · Hotel cost calculator

Why Owners Choose Recrea

  • One contractor for the whole hotel — structure, MEP, interiors, back-of-house, pools and site
  • Works while the hotel operates: phasing agreed with operations and revenue management
  • Brand and code compliance: operator design standards, Protección Civil, NOM and environmental conditions
  • Open-book or fixed price, weekly reporting for owners, asset managers and lenders
  • 18+ years and 196 projects in the Riviera Maya, own steel and carpentry workshops

Tell us about your hotel project

Frequently Asked Questions

In 2026 typically 2–4% of construction cost or a monthly retainer of $150,000–$450,000 MXN, depending on project size and involvement.

Yes, or we can act only as owner’s representative if you have another contractor. We agree the role at the start to avoid conflicts.

Yes. We review design and construction against the operator’s technical standards and manage approvals.

Put someone on your side of the table

Feasibility, budget control and opening date protected. Reply in 2 minutes.

Quote on WhatsApp
Owner's sideBrand standardsBudget controlProcurementLender reporting18+ Years

Related: Hotel Renovation in Cancún · Restaurant & Bar Fit-Out in Cancún · Beach Clubs & Spas in Cancún · Luxury Villa Renovation in Cancún · Wastewater Treatment Plants in Cancún · Water Purification & Desalination in Cancún · Villa Wastewater Systems in Cancún · Rainwater & Greywater Reuse in Cancún · Structural Steel in Cancún · Steel Roofs & Canopies in Cancún · Mezzanines & Floor Additions in Cancún · Steel Frame Homes in Cancún · Architectural Metalwork in Cancún · Corrosion Protection & Repair in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews