Free Quote — We reply in 2 minGet Quote

Hotel MEP Replacement and Energy Retrofits

Air conditioning, hot water and power are a resort’s biggest operating cost and its most visible failure: a warm room or a cold shower is a bad review. Many hotels on this coast run chillers, boilers and switchgear from their opening day, corroded by salt air. We replace and upgrade them while guests stay, and cut energy bills in the process.

Hotel MEP retrofit by Recrea
A Recrea Construction project
2026 costs: chiller plant replacement $4M–$25M MXN; VRF per guestroom $90,000–$180,000 MXN; heat-pump hot water plant $1.5M–$6M MXN; BMS $1M–$5M MXN; generator and switchgear upgrades priced per site.

Systems We Replace and Upgrade

Chiller Plants

High-efficiency chillers, pumps and cooling towers, swapped in phases without losing cooling.

VRF & Fan Coils

Guestroom and public-area systems with occupancy control.

Hot Water

Heat pumps and heat recovery replacing diesel or LP boilers.

BMS & Controls

Central monitoring of HVAC, pumps, lighting and alarms.

Electrical & Back-Up

Switchgear, transformers, generators and transfer switches sized for hurricanes.

Solar Integration

Rooftop and carport solar feeding hot water and power.

Replacing a chiller plant without warm rooms

We plan the swap around the low season, install temporary chillers when needed, and change units one at a time so cooling never drops below demand. Pipes, valves and controls are upgraded with the plant, and the new system is commissioned and trended on the BMS before handover. In salt air, we specify coated coils and stainless fixings so the new plant lasts.

MEP Retrofit Costs (2026)

SystemTypical scopeCost (MXN)
Chiller plantChillers, pumps, towers, controls$4M–$25M
VRFPer guestroom$90k–$180k
Heat-pump hot waterCentral plant$1.5M–$6M
BMSHotel-wide monitoring$1M–$5M

Useful pages: Hotel Services · Hotel Development Management · Brand Conversion & PIP · Hotel construction in Cancún · Hotel cost calculator

Why Hotels Choose Recrea for MEP

  • One contractor for the whole hotel — structure, MEP, interiors, back-of-house, pools and site
  • Works while the hotel operates: phasing agreed with operations and revenue management
  • Brand and code compliance: operator design standards, Protección Civil, NOM and environmental conditions
  • Open-book or fixed price, weekly reporting for owners, asset managers and lenders
  • 18+ years and 196 projects in the Riviera Maya, own steel and carpentry workshops

Tell us about your hotel systems

Frequently Asked Questions

Yes, in phases and with temporary chillers if needed, timed for the low season.

Typically 20–40% on HVAC and hot water when old chillers and boilers are replaced with high-efficiency plant, heat pumps and controls.

Both: we work with MEP engineers on design, then install, commission and document the systems.

Get an MEP and energy assessment

Plant survey, savings estimate and phased plan. Reply in 2 minutes.

Quote on WhatsApp
Chillers & VRFHot water heat pumpsBMSHotel stays openEnergy savings18+ Years

Related: Hotel Renovation in Cancún · Restaurant & Bar Fit-Out in Cancún · Beach Clubs & Spas in Cancún · Luxury Villa Renovation in Cancún · Wastewater Treatment Plants in Cancún · Water Purification & Desalination in Cancún · Villa Wastewater Systems in Cancún · Rainwater & Greywater Reuse in Cancún · Structural Steel in Cancún · Steel Roofs & Canopies in Cancún · Mezzanines & Floor Additions in Cancún · Steel Frame Homes in Cancún · Architectural Metalwork in Cancún · Corrosion Protection & Repair in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews