Demand for warehouses in Cancún comes from distribution for hotels and supermarkets, airport logistics, building materials and e-commerce, and good stock is scarce. We build industrial and logistics parks for developers and investors: master plan, roads for trailers, water, sewer and treatment, the power substation that decides who can rent, and warehouses for lease built in phases as tenants sign.
Lots, roads for 53-foot trailers, setbacks and green areas.
Substation and medium-voltage network sized for tenants, coordinated with CFE.
Wells or network, cisterns, sewer and a treatment plant.
Pavements, drainage and turning radii for trailers.
Standard shells with docks, built to suit or speculative.
Perimeter, gatehouse, access control and CCTV.
Cold storage, light manufacturing and data rooms need capacity the local grid often does not have. A park with its own substation and medium-voltage network can rent to tenants others turn away, so we size power for the target tenant mix and coordinate the CFE process from the start.
Infrastructure is built in phases along the main road; warehouses follow signed leases or a speculative first phase. Standard shells — clear height, docks, slab capacity — lease faster and finance easier.
Cancún is the largest market in the state: vertical condos along Bonampak, Malecón Tajamar, Puerto Cancún and the Hotel Zone, mid-rise buildings in Cumbres, Arbolada and Huayacán, and the most complete supply chain and labour pool in the region. Heights and densities are set by the urban development programme, and the high water table makes basements expensive.
Licences are issued by the municipality of Benito Juárez; we file the land use, construction licence with DRO and Civil Protection.
| Item | Cost |
|---|---|
| Park infrastructure per m² of saleable lot (roads, water, sewer, drainage, lighting) | $0–$1,000 |
| Power substation and medium-voltage network | $8M–$30M |
| Warehouse shell for lease, per m² | $6,000–$12,000 |
| Wastewater treatment plant for the park | $3M–$12M |
| 10-hectare park, infrastructure | $45M–$110M |
| First phase: 4 warehouses × 2,500 m² | $65M–$120M |
In Cancún: Branded residences · University campus construction · Auditoriums & convention centres · Supermarket renovation · Hospital & clinic renovation · School renovation · Construction permits · Commercial construction
Industrial park development in other towns: Puerto Morelos · Playa del Carmen · Chetumal
Related: Industrial park development · Branded residences
Commercial cost calculator · Plazas · Offices
Industrial warehouses
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews