After a Hurricane: Inspection, Claim and Repairs Step by Step
The first 72 hours after a hurricane decide how much of the damage your insurer pays and how much water gets into the structure. This is the sequence we follow for clients' houses, condos and hotels in Quintana Roo.
Related: Hurricane Shutters vs Impact Windows in the Riviera Maya · Lightning Protection for Villas and Hotels in Mexico · Hurricane Safe Room in a Mexican Coastal House
1. First 72 hours
- Only enter when civil protection allows; check for fallen lines and gas leaks.
- Photograph and film every room and façade before moving anything.
- Report the claim to the insurer immediately and get a claim number.
- Emergency works only to prevent further damage (tarps, boarding, pumping water); keep receipts.
- Don't throw away damaged items until the adjuster has seen them or approved disposal.
2. How hurricane cover works in Mexico
| Concept | Typical |
|---|---|
| Hurricane / hydrometeorological deductible | A percentage of the insured value (often 2–5%) per building |
| Coinsurance | Often 10% of the loss on top of the deductible |
| Underinsurance | If insured value is below rebuild cost, payout is reduced proportionally |
| Contents, loss of rent | Only if contracted |
Conditions vary by policy; read yours before June.
3. Technical inspection
- Roof and waterproofing: membranes lifted, drains blocked.
- Windows and doors: seals, anchors, water entry.
- Structure: cracks at slab-column joints, railings, palapa structure.
- MEP: A/C condensers, panels flooded, pumps, solar arrays.
- Moisture readings in walls to prevent mold (see mold).
4. Repairs and timelines
After a major hurricane, crews and materials are scarce for 2–6 months and prices rise. Prioritise envelope (roof, openings), then installations, then finishes. A written damage report with quantities and prices from a contractor speeds the adjuster's approval.
FAQ