Architect and Engineering Fees: What It Costs to Design a Villa in Mexico

Design fees are the first real money you spend on a project, and the part most often compared badly: one quote covers only drawings for the permit, another covers full construction documents and engineering. Here is what a complete design in the Riviera Maya includes and costs in 2026.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: Designing a Tropical House · Designing a Villa for Vacation Rental Income in the Riviera Maya · Setbacks, Neighbours and Party Walls When Building in Quintana Roo

1. Typical fees

ScopeTypical fee
Concept / schematic design onlyMXN 150–400 per m²
Permit drawings (architecture + structure for licence)MXN 350–800 per m²
Full architectural design + construction documents6–10% of construction cost, or MXN 700–1,800 per m²
Structural engineering1–2% of construction cost
MEP engineering (electrical, plumbing, A/C)1–2.5%
Interior designMXN 400–1,500 per m² or 8–15% of FF&E
Landscape designMXN 80–250 per m² of garden

2. What each phase should deliver

PhaseShare of feeDeliverables
Concept15–20%Programme, site study, sketches, massing, budget range
Schematic / anteproyecto20–25%Plans, sections, elevations, renders, preliminary budget
Construction documents / proyecto ejecutivo40–50%Detailed drawings, structure, MEP, finishes schedule, quantities
Site support10–20%Visits, answering RFIs, approving samples

3. Not included in design fees

  • Topographic survey, soil and karst study (see karst).
  • Environmental impact assessment if required.
  • Licence and DRO fees.
  • Renders or animations beyond those agreed; see 3D renders.

4. Design-build vs separate architect

With a separate architect you control the design independently and tender the construction; with design-build one firm is responsible for design, budget and execution, and design fees are usually lower because the documents are produced for the team that builds. Either way, insist on full construction documents before a fixed price.

FAQ

For a full custom villa design with documents, typically 6–10% of construction cost, plus engineering.

Yes, but a builder can't price or build accurately from permit drawings; expect change orders.

Usually the architect retains authorship; the contract should grant you the right to build and modify the project.

Typically 3–6 months for a villa, plus licence time.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews