1. Typical fees
| Scope | Typical fee |
|---|---|
| Concept / schematic design only | MXN 150–400 per m² |
| Permit drawings (architecture + structure for licence) | MXN 350–800 per m² |
| Full architectural design + construction documents | 6–10% of construction cost, or MXN 700–1,800 per m² |
| Structural engineering | 1–2% of construction cost |
| MEP engineering (electrical, plumbing, A/C) | 1–2.5% |
| Interior design | MXN 400–1,500 per m² or 8–15% of FF&E |
| Landscape design | MXN 80–250 per m² of garden |
2. What each phase should deliver
| Phase | Share of fee | Deliverables |
|---|---|---|
| Concept | 15–20% | Programme, site study, sketches, massing, budget range |
| Schematic / anteproyecto | 20–25% | Plans, sections, elevations, renders, preliminary budget |
| Construction documents / proyecto ejecutivo | 40–50% | Detailed drawings, structure, MEP, finishes schedule, quantities |
| Site support | 10–20% | Visits, answering RFIs, approving samples |
3. Not included in design fees
- Topographic survey, soil and karst study (see karst).
- Environmental impact assessment if required.
- Licence and DRO fees.
- Renders or animations beyond those agreed; see 3D renders.
4. Design-build vs separate architect
With a separate architect you control the design independently and tender the construction; with design-build one firm is responsible for design, budget and execution, and design fees are usually lower because the documents are produced for the team that builds. Either way, insist on full construction documents before a fixed price.
FAQ
Ready to Start Your Project?
196+ completed projects. Fixed-price contracts. Free quote within 48 hours.
Get Free Quote