Free Quote — We reply in 2 minGet Quote

Hotel Kitchens & Laundries on Holbox: Back-of-House That Works at Full House

Main kitchens, banquet kitchens, outlet kitchens and laundries for hotels on Holbox, rebuilt for full occupancy while service continues. Whale-shark season (June–September) and winter holidays are the peaks; construction is planned for late autumn and spring shoulder months.

Hotel Kitchens & Laundries on Holbox — Recrea
A Recrea Construction project
Holbox, 2026 references: Main / banquet kitchen: $3.9M–$15.6M; Outlet kitchen: $2M–$6.5M; In-house laundry: $5.2M–$19.5M.

What We Build Behind the Scenes

Main & Banquet Kitchens

Flows from receiving to plating, sized for peak banquet nights.

Cold Rooms & Stores

Chilled and frozen storage, dry stores and receiving docks.

Laundries

Washers, dryers, ironers and folding with water, steam and drainage sized correctly.

Water, gas and drainage for kitchens on Holbox

Power through a submarine cable fails regularly, water is scarce and sewage infrastructure is limited, so treatment plants, solar and back-up power are core hotel projects. Kitchen and laundry design starts with these supply limits: storage tanks, grease interceptors and water reuse are sized accordingly.

Equipment logistics on Holbox

Materials go by barge from Chiquilá and then by small vehicles on sand streets, so prefabrication, light systems and resident crews are the norm. Hoods, cold rooms and laundry machines are scheduled and installed with these access conditions in mind.

Permits and authorities on Holbox

Inside a federal protected area, every project needs environmental authorisation from federal agencies and Lázaro Cárdenas municipality; wastewater and density are the critical points.

Back-of-House Costs (2026) — Holbox

AreaTypical scopeCost (MXN)
Main / banquet kitchenFinishes, MEP, extraction, cold rooms$3.9M–$15.6M
Outlet kitchenRestaurant kitchen$2M–$6.5M
In-house laundryBuilding, installations, water$5.2M–$19.5M

Useful pages: Hotel Services on Holbox · Hotel Development Management on Holbox · Brand Conversion & PIP on Holbox · Hotel Construction in Holbox · Hotel cost calculator

Why Hotels Choose Recrea for Back-of-House

  • One contractor for the whole hotel — structure, MEP, interiors, back-of-house, pools and site
  • Works while the hotel operates: phasing agreed with operations and revenue management
  • Brand and code compliance: operator design standards, Protección Civil, NOM and environmental conditions
  • Open-book or fixed price, weekly reporting for owners, asset managers and lenders
  • 18+ years and 196 projects in the Riviera Maya, own steel and carpentry workshops

Tell us about your back-of-house — Holbox

Frequently Asked Questions

Yes. We work on Holbox, about three hours plus a ferry from our Playa del Carmen workshops, with the same project manager, phasing plan and weekly reporting we use on the rest of the coast; costs on Holbox run about 30% more than in Cancún.

Reference ranges on Holbox: Main / banquet kitchen (Finishes, MEP, extraction, cold rooms): $3.9M–$15.6M; Outlet kitchen (Restaurant kitchen): $2M–$6.5M; In-house laundry (Building, installations, water): $5.2M–$19.5M. Final figures depend on the survey, the brand standard and the phasing.

Plan your back-of-house upgrade

Survey, flows and phased plan. Reply in 2 minutes.

Quote on WhatsApp
LaundriesCold roomsHotel keeps serving18+ Years

Related: Hotel Renovation in Cancún · Restaurant & Bar Fit-Out in Cancún · Beach Clubs & Spas in Cancún · Luxury Villa Renovation in Cancún · Wastewater Treatment Plants in Cancún · Water Purification & Desalination in Cancún · Villa Wastewater Systems in Cancún · Rainwater & Greywater Reuse in Cancún · Structural Steel in Cancún · Steel Roofs & Canopies in Cancún · Mezzanines & Floor Additions in Cancún · Steel Frame Homes in Cancún · Architectural Metalwork in Cancún · Corrosion Protection & Repair in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews