Free Quote — We respond in 2 minGet Quote

Stormwater and Flooding: Keeping the Lot and the House Dry

Tropical storms can drop well over 100 mm in a few hours, and many streets in Cancún and Playa del Carmen have no storm sewer: the water goes into the limestone through wells, or sits in the street. A house that ignores this floods every rainy season.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: Foundations on Beach Sand in the Riviera Maya · Water Filtration for a House in the Riviera Maya

1. Check the risk first

  • Municipal risk atlas and flood-prone streets (ask neighbours after a heavy rain).
  • Lot level vs street level and vs neighbours.
  • Water table depth, shallow near lagoons and the coast.
  • Hurricane storm surge on first-line and lagoon lots.

2. Design measures

MeasureTypical cost (MXN, 2026)
Raise ground floor 30–60 cm above street levelFill and higher foundations: $150–$400 per m² of footprint
Slopes away from the house, at least 2%Part of landscaping
Trench drains at garage ramps and terraces$2,500–$6,000 per linear metre
Stormwater absorption wells (pozos pluviales)$25,000–$70,000 each
Rainwater harvesting tankSee water storage
Non-return valve on sewer connection$3,000–$10,000

3. What not to do

  • Basements or sunken garages without pumping and backup power.
  • Draining roofs onto the neighbour or into the septic system.
  • Paving the whole lot without absorption.
  • Door thresholds level with the terrace.

4. Sizing

Wells and drains are sized from the paved and roof area and a design storm; a typical 400 m² lot with 250 m² of roof and paving needs 2–4 wells depending on soil absorption. See absorption wells and hurricane checklist.

FAQ

Yes, they are the usual solution where there is no storm sewer; they must be separate from wastewater.

At least 30 cm above the crown of the street, more in known flood areas.

Paving, clogged wells and sediment reduce absorption; heavy rain exceeds capacity.

Often with drains, wells, raised thresholds and non-return valves.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews