Free Quote — We respond in 2 minGet Quote

How Much Does It Cost to Build a House in Chetumal? (2026)

Turnkey construction in Chetumal runs about 8% below Cancún for the same specification. Below are our 2026 ranges per m², example totals and the local factors that explain the difference. Municipality: Othón P. Blanco.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: Cost to Build a House in Bacalar · Cost to Build a House in Cozumel · Cost to Build a House in Isla Mujeres · Cost to Build a House in Holbox · Cost to Build a House in Mahahual

1. Price per m² by finish level (2026)

Finish levelMXN per m²USD per m²
Standard$14,000–$17,500$770–$970
Residential+$18,500–$24,000$1,020–$1,330
Premium$25,000–$32,000$1,380–$1,790
Luxury$35,000–$55,000$1,940–$3,070

Turnkey, excluding land, pool, design and permits. USD at 18 MXN.

2. Example totals

SizeStandard (MXN)Premium (MXN)
100 m²$1.38M–$1.75M$2.48M–$3.22M
150 m²$2.07M–$2.62M$3.73M–$4.83M
200 m²$2.76M–$3.50M$4.97M–$6.44M
300 m²$4.14M–$5.24M$7.45M–$9.66M

3. What makes Chetumal different

  • One of the cheapest towns to build in the state. State capital with local supply, lower labour costs and less tourist-driven demand.
  • Flood-prone areas. Low zones near the bay and old drainage channels flood; raise floor levels and check the municipal risk atlas.
  • Southern border zone. Some tax stimuli for registered businesses apply in Othón P. Blanco; see IVA on construction.

4. Not included

  • Land and closing costs
  • Design, licences and DRO: 6–10% of construction
  • Pool, landscaping, furniture
  • Contingency 5–10% (see overruns)

5. Before you buy land here

Run the land due diligence checklist and price utility connections; in Chetumal they can change the total more than the finish level.

FAQ

Roughly $2.07M–$2.62M MXN at standard finishes and $3.73M–$4.83M MXN at premium, turnkey and without land.

State capital with local supply, lower labour costs and less tourist-driven demand.

Typically 10–16 months of construction plus 3–6 months of design and permits.

Yes; inside the coastal restricted zone through a fideicomiso or Mexican company.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews