How Much Does It Cost to Build a House in Holbox? (2026)

Turnkey construction in Holbox runs about 30% above Cancún for the same specification. Below are our 2026 ranges per m², example totals and the local factors that explain the difference. Municipality: Lázaro Cárdenas.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: Cost to Build a House in Bacalar · Cost to Build a House in Cozumel · Cost to Build a House in Isla Mujeres · Cost to Build a House in Chetumal · Cost to Build a House in Mahahual

1. Price per m² by finish level (2026)

Finish levelMXN per m²USD per m²
Standard$19,500–$24,500$1,080–$1,370
Residential+$26,000–$34,000$1,440–$1,880
Premium$35,000–$45,500$1,950–$2,530
Luxury$49,500–$78,000$2,740–$4,330

Turnkey, excluding land, pool, design and permits. USD at 18 MXN.

2. Example totals

SizeStandard (MXN)Premium (MXN)
100 m²$1.95M–$2.47M$3.51M–$4.55M
150 m²$2.92M–$3.71M$5.26M–$6.83M
200 m²$3.90M–$4.94M$7.02M–$9.10M
300 m²$5.85M–$7.41M$10.53M–$13.65M

3. What makes Holbox different

  • No cars, sand streets. Materials go by boat from Chiquilá and then by small truck or cart; productivity is lower and logistics add 20–30% to materials.
  • Inside Yum Balam. The island is in a protected area; density, height and land use are tightly limited and environmental approval is the critical path. See what you can build.
  • Services. Power and water capacity are limited; plan for cisterns, efficient A/C and often solar backup.

4. Not included

  • Land and closing costs
  • Design, licences and DRO: 6–10% of construction
  • Pool, landscaping, furniture
  • Contingency 5–10% (see overruns)

5. Before you buy land here

Run the land due diligence checklist and price utility connections; in Holbox they can change the total more than the finish level.

FAQ

Roughly $2.92M–$3.71M MXN at standard finishes and $5.26M–$6.83M MXN at premium, turnkey and without land.

Materials go by boat from Chiquilá and then by small truck or cart; productivity is lower and logistics add 20–30% to materials.

Typically 10–16 months of construction plus 3–6 months of design and permits.

Yes; inside the coastal restricted zone through a fideicomiso or Mexican company.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews