Pre-Purchase Inspection: What to Check Before Buying a Resale Home
Home inspections are not a standard step in Mexican sales, so buyers rarely get one. On the coast, where salt, humidity and quick builds hide expensive problems, a technical inspection before signing is the best money you'll spend. This is what ours covers.
Related: Converting a House into a Boutique Hotel or Hostel in Quintana Roo
1. What we inspect
| Area | What we look for |
|---|---|
| Structure | Cracks at slab-column joints, deflection, spalling and exposed rebar |
| Roof and waterproofing | Age, ponding, blisters, ceiling stains |
| Moisture | Moisture-meter and thermal-camera readings, mold |
| Plumbing | Pressure test, leaks, pipe material, cistern condition |
| Electrical | Panel, earthing, RCDs, overloaded circuits, CFE tariff and load |
| A/C | Age, coil corrosion, condensate drainage |
| Windows and doors | Seals, corrosion, hurricane rating |
| Pool | Leaks, equipment, surface |
| Termites and wood | Doors, closets, ceilings, palapas |
| Paperwork vs reality | Built area vs licence and deed, completion notice, unpermitted extensions |
2. Cost and timing
| Property | Inspection fee (MXN) | Report |
|---|---|---|
| Condo up to 120 m² | $8,000–$15,000 | 3–5 days |
| House 150–300 m² | $12,000–$25,000 | 3–5 days |
| Villa 300 m²+ with pool | $20,000–$35,000 | 5–7 days |
3. How to use the report
- Negotiate the price with repair estimates.
- Ask the seller to fix before closing, with re-inspection.
- Plan your renovation budget; see condo renovation and complete renovation.
- Walk away if structure or permits are seriously wrong.
4. For condos also check
- HOA finances, reserve fund and planned special assessments.
- Condition of façades, roofs and common installations.
- Bylaws on rentals and renovations; see condo renovation rules.
FAQ
No, but it is highly recommended, especially on the coast.
After agreeing price and before signing the promise contract or with a clause that allows withdrawal.
They can, but it is a warning sign.
Yes, with a written report, photos and a video call walkthrough.
See also: Hotel construction permits in Quintana Roo · Cost calculator · All guides · Cost Guide (PDF)
Ready to Start Your Project?
196+ completed projects. Fixed-price contracts. Free quote within 48 hours.
Get Free Quote1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO